Which are different types of review ?
Answers were Sorted based on User's Feedback
Answer / selvam.m.c
1. peer view meeting
2. code walk through meeting(Informal Review)
3. Inspection Meeting(Fully formal Review)
4. Requirement review
5. Test Document review
6. Defect Review
7. Summary doc review
| Is This Answer Correct ? | 16 Yes | 4 No |
Answer / ks thangavel
1 formal review
2 informal review
1 formal review
a)inspection
2 informal review
a)walkthrough
b)deskchecking
c)peer review
1technical review
2mgmt review
| Is This Answer Correct ? | 11 Yes | 2 No |
Answer / swati
1. Requirement review
2. Design i.e DFD,ERD review
3. Code review
4. Test Plan review
5. Test cases review
6. Defect review
| Is This Answer Correct ? | 4 Yes | 0 No |
There are mainly 2 types of reviews
1. Formal Review
2. Informal Review
Under Formal Review we do Inspection
Under Informal Review we do Desk Checking, Walkthrough, Peer
Review.
Now for all these Review meeting we check for
1. Code coverage
2. unit functional coverage
3. Documentation review
4. Test plan review
5. Test Case Review
6. Release Review
7. Traceability review
and many more comes under any one of the above review meetings.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / mohan shekhawat
1) Walkthrough Review
2) tecnical Review
3) Inspection Review
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sandesh kore
Business Rquirement Review.
Code Review
Test Plan,Test Scenarios review and testcases review.
| Is This Answer Correct ? | 1 Yes | 1 No |
What Questions Project Manager will be aske?
What sort of things would you put down in a bug report?
Can you do system testing at any stage of sdlc?
Hi Friends , I am 1 year experience Manual tester and i want to do any certification but i dont know any thing about it. please do suggest me. Thanks in advance
approx how long a simple website take time just for manual testing including report generation.
what is change management and change request
what is test log..? what it consists?
SAY YOUR PRODUCT PASSED THROUGH TESTING & UAT. NOW IT WENT TO PRODUCTION AT CLIENT LOCATION AND THEY FOUND ONE DEFECT IN IT. HOW THEY NEED TO PROCEED NOW? WILL THEY CONTACT U? OR WILL THEY CONTACT DEVELOPMENT TEAM?
What are the differences between v-model and Agile Model
how much testing is enough.and why documentation is needed
For any web application, what are the possible login features that should be tested?
What types of documentation are used in qa?