what is entry and exit criteria?
Answers were Sorted based on User's Feedback
Answer / guest
Entry criteria: Before Integration criteria all unit test
cases should be passed and Unit testing should be completed.
Exit: When Integrated modules are working as per their
requirement and all integration test cases should be passed
without any critical/Major defects
| Is This Answer Correct ? | 5 Yes | 1 No |
unit testing output is entrylevel criteria for integration
testing.the same output is exit level criteria for unit
tsting.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / madhubabu
Entry criteria: 1)first study the SRS document and
understand the current project.
2)test environment established.
3)receiving the software build from the
programmers
exit criteria: 1)all major bugs are executed.
2)all expected test cases are solved.
3)time exceeded.
4).all minor bugs are solved
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / suvarna
Entry and Exit criteria means
Entry includes Pre Conditions like SRS(Usecases, Activity
diagram, mockup screens & HLDD, LLDD.
Exit includes Post Conditions like Traceability matrix and
Sign off.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sandeep
Entry criteria start with R&A phase
Evaluating exit criteria has the following major tasks:
o Checking test logs against the exit criteria specified in
test planning.
o Assessing if more tests are needed or if the exit
criteria specified should be changed.
o Writing a test summary report for stakeholders.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / suneel reddy
Entry criteria is nothing but how to approach particular
thing?
suppose in Test plan entry criteria is functional
description and exit criteria is approach
| Is This Answer Correct ? | 1 Yes | 4 No |
tell me test case for chair,pen,key board?
2 Answers GrapeCity, IBM, IBN,
iq test
Can anybody help me what is the diff between CMM,SEI,PCMM and six sigma?
can 2 tier architecture can be change as a 3 tier architecture
What is maturity level?
Could you tell me two things you did in your previous assignment (QA/Testing related hopefully) that you are proud of?
what is CAPA?when is root cause analysis done?
1 Answers Ariel, Knorr-Bremse, NIIT,
How does the Internal QA Audit relates with the ISO Standards level ?
What are the tests activities that you want to automate in a project?
Why we do load and performance testing?
Have you written test plan?
What are the tables in testplans