Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the entry creteria and exit creteria for system
testing

Answers were Sorted based on User's Feedback



What is the entry creteria and exit creteria for system testing..

Answer / rajesh ahirrao

For System Testing,Entry Criteria is-
1) SRD(S/W Req.Docs)should be freezed.
2) All Test Case writting should be completed,review.
3) Unit testing,Integration testing phase should be
completed.
Exit Criteria is -
1) All High Priority & HIgh Severioty defects should be
closed( fixed).
2) Application should be worked as per User's expectation.
3) Application should be meet successfully all the Users
requirements. etc..

Please suggest me if I am wrong...
Thanks,
Rajesh Ahirrao - (Hyderabad).
ahirrao.rajesh@gmai.com

Is This Answer Correct ?    15 Yes 0 No

What is the entry creteria and exit creteria for system testing..

Answer / harjeet kaur

Entry criteria for testing is as soon as SRS is prepared the
testing should be started. Exit criteria is decided by
either project manager or when the application starts
working normally.

Is This Answer Correct ?    9 Yes 3 No

What is the entry creteria and exit creteria for system testing..

Answer / kiranmayi

Entry and Exit criteria are defined by the company.In
general:

The Entry criteria are:

• The SIT code and environment shakedown was
successfully completed and there will be no interruptions
to the system test as a result of either
• Successful completion of unit testing and
integration tesing in development environment
• Updated Change Control Logs

Exit criteria are:

• All Requirements that are In Scope have been met
and the severity 1&2 variances are resolved.

Let me know if any questions
bommi_ki@yahoo.ca

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Manual Testing Interview Questions

Which is the best book to ref. for design the test cases/scenario in manual testing,which gives detailed idea with all the strategies ?

2 Answers   Satyam,


How much cost taken for testing activites in the project

2 Answers  


Write the function test case to add a customer to database.

0 Answers   Chase,


A general Question: If there are two bugs one with high priority and one with high severity, which bug should be fixed first?

5 Answers   Q3 Technologies,


Explain V model in depth?

2 Answers   Tech Mahindra,


what is regression testing & resting?

10 Answers   Wipro,


In Quality Center, If we can reuse a non reusable test script as template test, then what is the need of defining reusable test scripts? What additional functionality does Reusable test scripts add when compared to non reusable test scripts?

0 Answers  


what is tracebility matrix.what is tracebility template

6 Answers   Exalt,


What is meant by Poty testing?

2 Answers   Spectramind,


I would like to reserve railway ticket online and paying the fare through net banking. Friends help me to write test cases???? Give answer for this as soon as possible...

3 Answers   360Logica,


what is the test strategy you followed in your company

3 Answers   Infosys, TCS,


How can you test an application after production and deployed in to the clients system by connecting to the (Client's)server which is located somewhere in the US. I mean how can you connect and test when it is at maintenance

5 Answers   Oracle,


Categories