What is the entry creteria and exit creteria for system
testing

Answer Posted / kiranmayi

Entry and Exit criteria are defined by the company.In
general:

The Entry criteria are:

• The SIT code and environment shakedown was
successfully completed and there will be no interruptions
to the system test as a result of either
• Successful completion of unit testing and
integration tesing in development environment
• Updated Change Control Logs

Exit criteria are:

• All Requirements that are In Scope have been met
and the severity 1&2 variances are resolved.

Let me know if any questions
bommi_ki@yahoo.ca

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are some best practices that you should follow when writing test cases?

674


uses of checklist

1516


What are the different types of software testing?

705


Hi Could someone please provide Siebel Testing Interview questions for 5 years exp.

4414


I have 2 yrs 10 months experience in manual testing. there is a gap of 3 yrs in between. just 3 months before i rejoined the same company. I am looking for new & better job.What I have to enhance my career to up level, should I have to do Automation course or any other. Guide me properly.

1449






What is six sigma?

739


how mapp the defect id in quality center?

1684


What is white box testing?

753


how to verify a button size (e.g Login Button) on a web page have same dimension prescribed by Client in UI Testing..??

1147


Define what is a critical bug.

665


What are the queries mostly asked in testing ? give me some examples.

1451


What is bug leakage?

729


Inwhat basis the time is allocated for testing the application?

1416


how to test the case with 5 combination and inputs

1602


define risk management system with example ?

1555