How do you create Test script from Quality centre Using QTP

Answers were Sorted based on User's Feedback



How do you create Test script from Quality centre Using QTP..

Answer / s saritha

In TD 7.2 ,Bydefault winrunner is integrated with TD.and
for QTP you will have to buy plug in.that option or
apropriate link you will get oh home page of TD.

Is This Answer Correct ?    3 Yes 6 No

How do you create Test script from Quality centre Using QTP..

Answer / xyz

in qc test scripts will be generated in testplan module,by
creating the tests in which u need to write all the steps
needed for the testing should be written first in manually
then clicking on the script generate button in design
steps,then qc will prepare a dummy script in test script
tab now open the test script tab and click on the quality
center button ,now the tool will be opened
automatically,after u need to write the script,save n close
the same script will be refcted to the qc test script
tab....thats why qc generate the test scripts

Is This Answer Correct ?    8 Yes 15 No

Post New Answer

More Test Director Interview Questions

How do I run reports from test director?

0 Answers  


How many Reports Can be Got from Test Director?

3 Answers   TCS,


What are the drawbacks of TD??

0 Answers   SISL,


How to identify test cases with no scheduled test runs.

0 Answers  


HOw to map testcases with requirements in test lab?

3 Answers  






How do we import testcases written in excel to test director?

0 Answers  


What r the tabs in Quality Center? explain briefly.

8 Answers   Chase, Hexaware,


How do you ensure that there are no duplication of bugs in Test Director?

0 Answers   Perot Systems,


In automation testing(QTP), how we find the bugs?

5 Answers   Accenture, Mind Tree,


How many Test Managers in Test Director? Skjha2000@rediffmail.com

3 Answers   Cognizant,


Is QC comes under functional testing or not?

1 Answers   CTS,


How you integrated your automated scripts with testdirector?

0 Answers  


Categories