you filed a bug that has high severity & high priority what
happens till it gets fixed(that means what u do till it
gets fixed)? Urgent
Answers were Sorted based on User's Feedback
Hi,
If it is a show stopper defect that means you
can't proceed without fixing it then you have to wait until
developers fix it. If it is not a show stopper even though
it is a high priority and high severity,you have to login
the defect and you can proceed with your execution of the
test cases.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / rajiv kukreti
If you have already filed a bug that means that you already
have test scenarios ready with you for
reverifying/retesting that bug.
Only thing now you have to do is because it is of high
severity and high priority bug, you need to convey it to
the stake holders about it. Also, you need to track that
bug to get it resolved by developer ASAP. You can do it by
repeatedly following it with developer.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / keshab
two option will be there
if u are onsite : u will convance to client & find out way
to test that problem & how many functionality will affect
with this problem according u will design test case
if u are offsore : find out way to test that problem & how
many functionality will affect with this problem according
u will design test case
| Is This Answer Correct ? | 0 Yes | 3 No |
what is the difference b/w test scenario and test case? pls explain with one example the preparation of both? thanks in advance ................
if tester found some bugs in the application then which format they will send it to development team.
Can Any one tell me How to test Stand alone application? wht are the major points to cover & how performance is tested of this application?? can any 1 tell me its bit urget for me guys.
A server configuration is controlled from a single web page with multiple options: ● 20 drop-down menus, with 3-4 options each. ● 5 check-boxes. ● 1 multi-select menu, with 5 options. ● 1 template selection, with 6 options: A, B, C, D, E, F. ○ When options A, B, C, D are selected, all options (#1-#3) above are available. ○ When options E, F are selected, only 10 out of 20 drop-down menus have an effect. ● Besides item #4, developers input is that all options are independent, I.e., not impacting each other. What is the required number of test configurations required in order to test the server configuration and release in good quality: a) Assuming first release. b) Assuming regression tests for release with new features not impacted by the above options. Test configuration is a complete set of options that were selected to be tested in one complete server configuration scenario. I.e, a test configuration is set of 17 or 27 specific options tested together.
List 5 major test cases for Lift
2.what is the differnce bet project volume and v.s.s and what is the advantage of v.s.s?
What is information flow in testing
Hi, this is murthysharma. I need very urgently about some terms which are used in use cases? Plz give reply to me, if any body know, It is really very very urgent. 1. what is the difference between basic flow,exception flow and alternative flow? 2.what are non-functional requirements in use cases? 3.what are exceptions, special requirements, business rules, assumptions, constraints. Kindly give me with the example. Bcoz, I am very new to this use cases. thanks in Advance. Regards, M.MurthySharma
What is the difference between walkthrough and inspection? Give me the exact difference.
What is test case of dustbin ?
5 Answers Campus Interview, eXtensible IT Solutions, Hewitt, TCS,
Why white box testing techniques are also called as clear and glass box testing teschniques?
last week i attended tawant technologies. it may be useful for for u. i could not remember every qustion and answer. . 1. verfification is a. r we buliding the sys right? b. r we buliding the right sys? 2. regeression tetsing a. always can be done automation b.unchanged areas have not been affected c. changed areas have not been affected. 3.Equalent class partition is a.white box tetsing technique b.Black box tetsing technique ........ c.black box .............. 4.arrange order unit testing,integartion, validation, sys tetsting 5.debugging is a.testing activity b. developement activity c........ d......... 6.security tetsting a. bullet prooof...... wrapped s/w b....... 7.smoke testing a..... 8.defect managent tool does not conatin a. b. 9. sys reliability a. 10.user accceptance tetsing is done by a.tester b.developer c.end users d........ 11.which is not static testing technique a.walk through b.inspection c. d. 12.wat is diff b/w? if the s/w isdeveloped by other country if the s/w isdeveloped by ur country? a.culturtal diff b. re allocation resources. c...........no ctrl pf process d........ plz go through these topics.....i am not able to rememeber every qusetion and answers. sorry let me know u ahve any questions.u can add here extra questions. brahma412@yahoo.co.in
3 Answers Tavant Technologies,