what is the difference between lifecycle model and v-model
Answers were Sorted based on User's Feedback
Answer / suneel reddy
U mean lifecycle model in the sense Waterfall model
Ok diff is nothing but all phases are dependent
i mean one phase output is input 4 another phase
In V model 4 every development phase we have testing phase
pareell
all phases are independent
Is This Answer Correct ? | 7 Yes | 1 No |
left side rightside
BRS/Verification->Acceptence testcases preparaton validation
SRS/Verification----->System testcases preparions/Validation
Design/Verification-->Integratin tcases preparation/Validati
Buildlevel/Verificat--> unit test cases prepa/Validation
Simultanious approach in V model
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / roshni
In SDLC, testing comes ONLY after the implementation stage
whereas in V- Model, testing is carried out parallelly with
all development phases i.e right from the user
requirements it's reviewed.
Is This Answer Correct ? | 2 Yes | 3 No |
Answer / siddiq
Life Cycle Model V-Model
(1) Express all phases of Software. Express til
testing only.
(2) Use full when requirements are stable. Usefull when
requirements are not stable also.
(3) Testing is a Phase here. Testing is an
activity(involves in every phase)
(4) Testing uncouncious model Testing
concious model.
(5) QA,V&V and Reliability are not effective. Are effective
here.
(6) Follows ETVXM architecture. (6) Same here
but still efficiently
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / lm
VMODEL - V- Model which talks about Verification and
Validation. Left side of V-model called verification
( Requirement analysis ,
Specification,Design,Implementation) Right side of V-model
called Validation ( Unit testing , integration
testing , system testing,User acceptance testing)
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / emran
diff b/w Life cycle model & V model is
Life cycle model the process will be Step by step and u'd to
develop test cases in each stage
V MODEL:- Both developement & testing will go parallely
Is This Answer Correct ? | 0 Yes | 2 No |
different between bitmap checkpoint and image checkpoint ?
In "V" model, how OQ is related to DS.
u know the control flow & data flow then what type of testing u want to choose?
What is IEEE? Why is it important?
Dear all I need an advice about sqa field last year i have completed my graduation in computer engineering and i have just started my career as Software engineer in QA field and working in a software company. The problem is that I am very confused about my career in this field because I want to know that how much it's necessary that the programming concepts and the programming should be strong if the person is working as a sqa engineer if i talk about myself i can create logic with respect to programming but for me it's very difficult to implement my logic in form of code and is programming field has strong scope over sqa field and as a sqa engineer what will be my prestige in front of programmers. I want to know what appourtinutes i will get in this field after some period of time and what will be the next step(desigination)in that field.Kindly reply Regards
Explain what is mr and what information does mr consists of?
what is entry and exit criteria?
A water-quality monitoring system?
Define Quality testing ?
What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)
What is the Major difference between QTP ; LoadRunner? If u want to test an 1. erp module which automation tool you would prefer and why? and 2. for web application, which tool and why?
In an Interview I have been asked the following questions, 1) How would allocate job to your team members if you are assigned a role of Team Lead. 2) The second question was, do you follow any technique for the distribution of time while assigning jobs to your team members. For, both the questions I was clueless to answer. Please give me a practical approach for the above questions.