User acceptance test was conducted after the system testing
in two ways,alpha testing and beta testing
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / rajesh sikchi
UAT is performed after all the testing cycles
(unit/system/intergration and regression) have been
completed and before the code/module is rolled out into
production.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vijay
UAT has been performed after completion of the syestem
testing.
UAT is 2 types
Alpha testing
Beta Testing
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / kalyani.b
The UAT was done after completion of System level testing.
The test engineer will perform testing on the user desired
areas of the application.
| Is This Answer Correct ? | 0 Yes | 0 No |
How do u find Synchronization problems manually?
Have u ever done testing related to a database,give examples to support u r answer.
What is manual testing?Is any different types of testing in this?
If a bug is not reproduced what will be the next action of the tester?
tell me some gud sites for testing??
What is the difference between debugging and manual testing?
what is configuration management...please explain... thanx
If we have no SRS,BRS but we have test cases does u execute the test cases blindly or do u follow any other process|
how much money you will spend to join in r company
can any one explain the example of high servity and low priority, low servity and high priority, high servity and high priority, low servity and low priority
What is Defect containment?
4 Answers Accenture, University,
for example, if we have a textbox ranging from 0-100. which methodology we are using & what are inputs we are observed?