After which phase you are performing UAT?
Answers were Sorted based on User's Feedback
Answer / satyaprasad
User acceptance test was conducted after the system testing
in two ways,alpha testing and beta testing
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / rajesh sikchi
UAT is performed after all the testing cycles
(unit/system/intergration and regression) have been
completed and before the code/module is rolled out into
production.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vijay
UAT has been performed after completion of the syestem
testing.
UAT is 2 types
Alpha testing
Beta Testing
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / kalyani.b
The UAT was done after completion of System level testing.
The test engineer will perform testing on the user desired
areas of the application.
| Is This Answer Correct ? | 0 Yes | 0 No |
How you will do the functional testing ?
explain V module.
What is difference between SDLC and STLC?
16 Answers College School Exams Tests, HCL, TCS, Verizon,
How to write mail to bug report in manual testing with example?
Why does software have bugs?
What is Defect Seeding?
What is the diff betwn Functional nad regression testing and do u excute same test case or write new one for regression
What’s the difference between verification and validation in testing?
What is comprehensive testing
what is difference between severity and priority? what is difference between bug and defect?
23 Answers AD Solutions, Cognizant,
What are the key challenges of testing?
What is the difference between version and build.
6 Answers AppLabs, CTS, Seed Infotech,