Answer / geek
You can do all of the following on the Work Order-less
Completions window:
-Complete unscheduled or scheduled assemblies to Inventory
-Return unscheduled or scheduled assemblies from Inventory
-Scrap assemblies from and return scrapped assemblies to any
operation
-Explode the assembly's bill of material and add, delete,
and change components-and review items under lot and serial
number control
-Specify lot, serial, and lot and serial information for
assemblies and components.
-Create material reservations for assemblies that are linked
to sales orders
-Replenish production kanbans
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / mohan
Work order less completion in WIP helps us to complete the
job manually without creating a job.
example.
Suppose client wants to continue a job creation function in
other ERP like peoplesoft,SAP but they wants to track
inventory in Oracle apps at that we used to go for Work
order less completion.
| Is This Answer Correct ? | 4 Yes | 0 No |
I got my new offer as Functional consultant in Oracle Apps. Now i m having only domain knowledge ( SCM ). Will anybody explains briefly abt the Manufacturing process in Oracle Apps ??
What all diffrent typw of resources are there?
what is an attribute from which we can distingwish an orgnisation and master item organisation?
What are the modules generally covered under Oracle Manufacturing Apps
11 Answers Al-Qahtani, Axis Solutions, Wipro,
What is oracle apps project planning? is it module if so what are the contents of this module? please explain.
What do you mean by Planning Item?
How do you ensure on and availability are daily base for min max planning?
what setups are done in BOM?
what are reference designators and how they are used practically .Please site few examples.
What is the use of display option in Routing and Bill of Material.(e.g Current, Current and Future) and Checked Implemented.
What are step included to make a final assembly?
what is differnce between Tomanufactring leadtime and total lead time and total cumulative lead time?