Answer / rekha rajora

Sorry Sahu.I think u didnt understand the Question.
What I feel is that she wanted to know about what to tell
if somebody ask about your project on which u are working
or worked.

In My opinion Whenever you go for an interview make sure
that you Should know the detail of the functioning of the
project.
When the interviewer ask about your project tell him the
following:-
1. Current project on which you are working.
2. Main funtionality of the project.
3. Number of tables(tbl) in the project.
4. Your responsibity (which is mandatory)

Make me correct if I m wrong.

Is This Answer Correct ?    0 Yes 0 No

Iam searching for a job in manual testing(2.9yrs exp) i faced no.of interviews they r asking me to..

Answer / ch.s.m.prasad,kkd

u r answer exactly correct Rekha.............

Is This Answer Correct ?    0 Yes 0 No

Iam searching for a job in manual testing(2.9yrs exp) i faced no.of interviews they r asking me to..

Answer / saru

Firstly be careful in showing 2.9 yrs of
experience.Interviewers think you know many things. and if
you have 2.9 yrs of experience means, the start of project
testers are involved. they are provided training on the
product along with the developers,etc. then the Test
Manager or lead writes the test plan. then as per the
responsibilities defined in the test plan, a test engineer
starts writting the test cases. Once the code is ready, a
build is sent to the testing team in .exe form and testers
start testing the application. then test results are
generated and for each test case bugs are reported, then
test result is reported and then a test report is generated
after the completion of testing. this test report is
generated by the Manager or Lead.

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Manual Testing Interview Questions

How to test the functional specification?

1 Answers   Crea,


What is bug life cycle?

2 Answers  


When you found any bug before release product to the customer.what will you do????what will be your aproach?

3 Answers  


What is the difference between high level design and low level design with example

6 Answers   CTS, TATA, Wipro,


who is releasing the project?PM/TL?

3 Answers  






what is Non-Functional testing? & their types?

9 Answers   AppLabs,


Give me different methodologies used in testing?

4 Answers   Cap Gemini,


When to start Software Testing?

2 Answers  


How to track a bug that appears number of times(i.e what is the way to calculate that a particular bug is appearing number of times evenafter fixing it).

5 Answers  


How would you do the ollowing Security Testing for web application? 1) Authentication. 2) Authorization. 3) cookies. 4) penetration testing. 5) session testing. 6) encryption and decryption testing pls give examples give example i can't understand so pl

0 Answers   Wipro,


I m beginner to testing.. plz send me manual testing material or tell me best site for testing where i can get from fundamentals...

2 Answers  


How many Test case we can write to test MS Excel(for System Testing)

2 Answers  


Categories