Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


it takes 8 , 12 and 16 days for A , B and C to complete to
task . how many days will it take if A works on the job for
2 days and then B works on it until 25 % of the job is left
for C to do , and C completes the work ?

Answers were Sorted based on User's Feedback



it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / sabarish

12 days.

work done by A in 1 day = 1/8.
for 2 days its 1/4.
remaining work is 1-1/4=3/4.

25 % of work is done atlast be C.
thrfore it is 1/4.

work done by B = 3/4-1/4 = 1/2.
days for B to complete is (1/2) /(1/12) = 6

days for C to complete 1/4 of the job (1/4) /(1/16) = 4.


A takes 2 days , B takes 6 days and C takes 4 days.
total is 12 days.

Is This Answer Correct ?    50 Yes 1 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / ramesh

12 days(100% sure ans)

Is This Answer Correct ?    16 Yes 3 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / himanshu

Que is in how many days total work is completed
A. 8day
B. 12 day
C. 16 day
Total work 48
A. 6 unit per day
B. 4 unit per day
C. 3 unit per day
A works for 2 day =12
B works untill 25% of work completed so 48×25%=12 and that mean C works for 12
So A +C = 12+12=24
SO
Remaining is 24
B =24/4 =6
So at last A work for 2 day B work for 6 day and C works for 4 Day total 12 days

Is This Answer Correct ?    1 Yes 1 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / gunasekar

for A, 2 days.
for B is =25% job left for C
i.e= 4 days
for c =0 days
the total days are: 6

Is This Answer Correct ?    1 Yes 11 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / saranya

C = 25 1/2days (c will completes the work.)

Is This Answer Correct ?    0 Yes 10 No

it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A..

Answer / ritu

it will take 18 days to complete the work.

Is This Answer Correct ?    2 Yes 16 No

Post New Answer

More General Aptitude Interview Questions

A bus started from bustand at 8.00am, and after staying for 30 minutes at a destination, it returned back to the busstand. The destination is 27 miles from the busstand. The speed of the bus is 18mph. During the return journey bus travels with 50% faster speed.At what time does it return to the busstand?

0 Answers   Accenture,


A 5 litre jug contains 4 litres of a salt water solution that is 15 percent salt. If 1.5 litres of the solution spills out of the jug, and the jug is then filled to capacity with water, approximately what percent of the resulting solution in the jug is salt? (A)7.5% (B)9.5% (C) 10.5% (D) none

13 Answers   HCL, IBM,


9 laboures can complete the construction of a wall in 18 days. How many less days will 12 laboures take to complete the same wall?

1 Answers   Wipro,


vernanlar : place :: finger print : ?

0 Answers   CTS,


if 2x-y=4 then 6x-y is

0 Answers  


what is the angle between teo hands of a clock when time is 8-30?

11 Answers   Patni,


A can work three times as B can work. If A takes 60 days less than B to complete the same task, calculate the number of days when both A and B start working together on the same day.

0 Answers   CGI,


2435/24=24?

4 Answers   HDFC, TCS,


If ?CERTAIN? is coded as ?XVIGZRM?, then how can ?MUNDANE? be coded in that language ? (A) NFMWZMX (B) VMZWMFN (C) NFMWZMV (D) MFMXZMV (E) None of these

2 Answers  


Let C be a circle with centre P0 and AB be a diameter of C. Suppose P1 is the mid point of the line segment P0B, P2 is the mid point of the line segment P1B and so on. Let C1, C2, C3, ...... be circles with diameters P0P1, P1P2, P2P3 ... respectively. Suppose the circles C1 C2, C3, .... are all shaded. The ratio of the area of the unshaded portion of C to that of the original circle C is

4 Answers   CAT,


Sum of slopes of 2 perpendicular st. lines is given. Find the pair of lines from the given set of options which satisfy the above condition?

0 Answers   Accenture, BSNL,


In whose memory world youth day is celebrated ?

2 Answers   Mansi,


Categories