it takes 8 , 12 and 16 days for A , B and C to complete to
task . how many days will it take if A works on the job for
2 days and then B works on it until 25 % of the job is left
for C to do , and C completes the work ?
Answer Posted / gunasekar
for A, 2 days.
for B is =25% job left for C
i.e= 4 days
for c =0 days
the total days are: 6
| Is This Answer Correct ? | 1 Yes | 11 No |
Post New Answer View All Answers
Q.19 Alok and Bhanu play the following min-max game. Given the expression N=9+X+Y–Z where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be 27 18 20 Answer is: 20 can someone plzzzzzzzzz tell me how this answer is calculeted???
In a class of 60 students, a student of weight 45 Kg leaves the class. The average weight of the class is then increased by 200 gms. What is the average weight of the remaining 59 students in the class?
600 tennis players 4% ->wrist band on one wrist of remain 96%->25%->on both hands remain no of ---
Asmita invests an amount of Rs. 9535 at the rate of 4 per cent per annum to obtain a total amount of Rs. 11442 on simple interest after a certain period. For how many years did she invest the amount to obtain the total sum?
Write a C Program to declare an array for 2 0 floats. Accept the values from the user sort the two arrays in descending order. Merge the two arrays into a new array and display the new array.
The rectangle box with square base is open at the top. The maximum volume of the box made from 1200 m2 tin,in m3 is?
Two distinct no's are taken from 1,2,3,4......28. Find the probability that their sum is less than 13
How many mashes are there in a sq. m of wire gauge. Each mesh being 8mm long X 5mm width
3 red and 4 blue balls are in a basket. A member of PPTeam is drawing balls from the basket.What is the probablity of getting the 3 red balls simultaneously?
If POINT + ZERO = ENERGY, then E + N + E + R + G + Y = ?
There are 1000 doors that are of the open-close type. When a person opens the door he closes it and then opens the other. When the first person goes he opens-closes the doors ion the multiples of 1 i.e., he opens and closes all the doors. When the second goes he opens and closes the doors 2, 4 6 8 rely. Similarly when the third one goes he does this for 3 6 9 12 15th doors rely. Find number of doors that are open at last.
Find sqrt of 113 up to 3 decimal places.
Radha, Geeta & Revathi went for a picnic.After a few days they forgot the date,day and month on which they went to picnic.Radha said that it was on Thursday,May 8 and Geeta said that it was Thursday May 10.Revathi said Friday June 8.Now one of them told all things wrongly,others one thing wrong and the last two things wrongly.If April 1st is tuesday what is the right day,date and month?
A person has his own coach&whenever he goes to railway station he takes his coach.One day he was supposed to reach the railway station at 5 O'clock.But he finished his work early and reached at 3 O'clock. Then he rung up his residence and asked to send the coach immediately. He came to know that the coach has left just now to tje railway station. He thought that the coach has left just now to the railway station.He thought that he should not waste his time and started moving towards his residence at the speed of 3mi/hr.On the way,he gets the coach and reaches home at 6 o'clock.How far is his residence from railway station.
any body send me the sample paper for pnb dy.managers,to ravitejareddy.r@gmail.com