In a certain code language, the word ENQUIRY is written as
YRIUQNE. How will the word REQUIRE be written in the code
language ?

(a) QERUERI

(b) REQUERI

(c) ERIUQER

(d) IREUQER

(e) None of these

Answers were Sorted based on User's Feedback



In a certain code language, the word ENQUIRY is written as YRIUQNE. How will the word REQUIRE be wr..

Answer / guest

( c ) ERIUQER

Is This Answer Correct ?    11 Yes 0 No

In a certain code language, the word ENQUIRY is written as YRIUQNE. How will the word REQUIRE be wr..

Answer / rasika

(c) ERIUQER

Is This Answer Correct ?    4 Yes 0 No

In a certain code language, the word ENQUIRY is written as YRIUQNE. How will the word REQUIRE be wr..

Answer / sudha

c

Is This Answer Correct ?    3 Yes 0 No

In a certain code language, the word ENQUIRY is written as YRIUQNE. How will the word REQUIRE be wr..

Answer / sibil

c

Is This Answer Correct ?    3 Yes 0 No

In a certain code language, the word ENQUIRY is written as YRIUQNE. How will the word REQUIRE be wr..

Answer / sunil902

Answer is C

Is This Answer Correct ?    2 Yes 0 No

In a certain code language, the word ENQUIRY is written as YRIUQNE. How will the word REQUIRE be wr..

Answer / pooja singh

(d)ERIUQER

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More General Aptitude Interview Questions

Two cars, 15 km apart one is turning at a speed of 50kmph other at 40kmph . How will it take to two cars meet.

8 Answers   Accenture, CMC, SunGard,


Three men A,B,C can complete a work separately in some specified days(may be6,7,8).If they do the work together by alternate days. Then how many days need to complete the work?

2 Answers   CTS,


A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

0 Answers   Wipro,


A person was fined for exceeding the speed limit by 10mph. Another person was also fined for exceeding the speed limit by twice the same. If the second person was travelling at speed of 35mph . Find the speed limit ?

6 Answers   Accenture, Asha Chemicals, TCS,


Time constant for an integrator and differentiator should be

0 Answers   Flipkart,






A boy multiplied a number with 10 and got 100,instead of dividing it . If he divided it what would be the answer?

0 Answers   IBM, TATA,


If Log2 x - 5 Log x + 6 = 0, then what would the value / values of x be?

0 Answers   iNautix, Wipro,


what is the Aptitude test?

2 Answers  


78 x 14 + 7645 ? ? = 8247 (a) 580 (b) 590 (c) 490 (d) 480 (e) None of these

2 Answers  


Q.15 For the FIFA world cup, Paul the octopus has been predicting the winner of each match with amazing success. It is rumored that in a match between 2 teams A and B, Paul picks A with the same probability as A’s chances of winning. Let’s assume such rumors to be true and that in a match between Ghana and Bolivia, Ghana the stronger team has a probability of 2/3 of winning the game. What is the probability that Paul will correctly pick the winner of the Ghana-Bolivia game? 4/9 2/3 1/9 5/9 Answer is: 5/9 can someone plz explain how this ans is calculated?????

4 Answers   TCS,


area of triangle=1/2*b*h base incresed by 4 times & height is devided by 2, the net effect of area

7 Answers   Wipro,


If 9 examiners can examine a certain number of answer books in 12 days , working 5 hours a day ; for how many hours a day would four examiners have to work in order to examine twice the number of answer books in 30 days ?

6 Answers  


Categories