A and B combinely can do a work in 4 days. If A alone can
do a piece of work 6 days. In how many days B alone can do?
a) 8 days b) 6 days c)10 days d) 12 days
Answers were Sorted based on User's Feedback
Answer / ashish madhavi
Hey buddies no need for any type of calculation this
problem can b solved orally
METHOD:
to any type of an problem on WORK
first collect the numbers in the question and find the
common multiple
for eg in our above question (4,6) common multiple = 12
so suppose there are 12 files to b completed
A alone can do the work in 6 days
therefore /day A completes 2 files
A & B together completes the work in 4 days
therefore /day they complete 3 files
therefore as A completes 2 files /day B completes 1 file/day
so B alone requires 12 days to complete the work (1 file
each day)
| Is This Answer Correct ? | 0 Yes | 0 No |
Mr. Shah decided to walk down the escalator of a tube station. He found that if he walks down 26 steps, he requires 30seconds toreach the bottom. However, if he steps down 34 stairshe would onlyrequire 18 seconds to get to the bottom. If the timeis measured fromthe moment the top step begins to descend to thetime he steps offthe last step at the bottom, find out the height ofthe stair way in steps?
3 Answers iNautix, Innominds, OFSS, Wipro,
(103.7 x 101.3)2 = 10? (a) 6 (b) 7 (c) 10 (d) 3 (e) None of these
A boy asks the relation of two people walking along the street. One of them says that the lady walking with him is the daughter of his mother's only son. What is the relation between the two people?
A man shapes 3 cardboards in 50 minutes,how many cardboards does he shape in 5 hours? answer 18cardboards.
How can you add value to our Organization if offered appointment
5 Answers BPO, Ernst Young, State Bank Of India SBI, Wipro,
The cost of four dozen proof machine ribbons and five dozen accouting machine ribbons was Rs.160/-. If one dozen accounting machine ribbons cost Rs.20/-, what is the cost of a dozen proof machine ribbons?
The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programmer sends a program to receiver. There it waits for 10 milliseconds. And response will be back to programmer in 20 milliseconds. How much time the program takes to get a response back to the programmer, after it is sent?
1 Answers Accenture, BSNL, TCS,
a bus started from bus stand at 8.00am and after 30min staying at destination it returned back to the buss tand.the destination is 27 miles from the bustand the speed of the bus 50percent fast speed at what time it returns to the bustand.
If + means * and * means / and / means %. what is the value of 2+3*5/7?
find missing no 6 7 8 8 8 ?
One skirt requires 3.75 yards of cloth. How many skirts you can make from 45 yards?
0 Answers BPCL Bharat Petroleum, Sonata,
In a family, the average age of a father and a mother is 35 years. The average age of the father, mother and their only son is 27 years. What is the age of the son?