A and B combinely can do a work in 4 days. If A alone can
do a piece of work 6 days. In how many days B alone can do?
a) 8 days b) 6 days c)10 days d) 12 days
Answer Posted / harsha
can somebody give steps
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?
What is the angle of degree suspended when two hands of clock showing the time 2.30.
1,40,00,000 pencils are put up straight. All the pencils are of length range 3 to 6 inches. 80% of the pencils have average of five inches. So find out the total length spanned by the pencils?
A piece of cloth costs Rs 35. If the piece were 4m longer and each meter costs Re 1.00 less, the cost would remain unchanged. How long is the piece?
if the area of square increases by 69% then side of the square increases by:
WHAT IS THE NUMBER OF ZEROS AT THE END OF THE PRODUCT OF THE NUMBERS FROM 1 TO 100
Gaurav buys milk at Rs. 60 per litre, adds water to it and then sells it at Rs. 75 per litre. What should be the ratio of milk to water to get a profit of 37.5%?
How many 1's are there in the binary form of 8*1024 + 3*64 + 3
A building with height D shadow upto G. What is the height of a neighbouring building with a shadow of C feet.
a man works. He has to maintain 100 cups. He gets 30 ps for every cup he safeguards and has 10 pay 90 ps for every cup he breaks.if he earns rs.24 per day, how many did he break?
In a helpful book on the indexing and searching of text-based electronic files, a well-respected computer scientist differentiated _____________________ search efficiently using augmented inverted indices. latent semantic indexing, which is a technique designed to analyze relationships among the words within documents, with vector space models, which can between latent semantic indexing, which is a technique designed to analyze relationships among the words within documents, and vector space models, which can between latent semantic indexing, which is a technique designed to analyze the relationships among words within documents, with vector space models, which can latent semantic indexing, which is a technique designed to analyze the relationships among words within documents, and vector space models, which can
A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.
if A = D, B=E, C=F, VWDUW = ?
if a,b>0 and a+b=2 then the max value of ab is
Time constant for an integrator and differentiator should be