A and B combinely can do a work in 4 days. If A alone can
do a piece of work 6 days. In how many days B alone can do?
a) 8 days b) 6 days c)10 days d) 12 days
Answer Posted / lavanya
b) 6 days
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
'X' liters of petrol can be filled in an automobiles tank. What part of full tank was removed, if 'Y' liters was removed when the tank was full?
A>B,B>C,C=D,D>E,then which is greatest?
There are three trucks A, B, C. A loads 10 kg/min. B loads 13 1/3 kg/min. C unloads 5 kg/min. If three simultaneously works then what is the time taken to load 2.4 tones?
Four Members A, B, C, D are playing a game .A person losing a game should double the amount of others .B, C, D are losing in order after three games .The amount after 3 games are A&B having 40,D is having 16&C 80. Who started with small amount of money?
5) Write a program that takes a 3 digit number n and finds out whether the number 2^n + 1 is prime, or if it is not prime find out its factors.
The distance b/w 2 places is 1000 miles and a man has a camel which eats an apple/mile. He has 3000 apples and want to transport from one to another. Camel can take 1000 apples at a time. when reaching the destination how many apples will be with him?
I most like to work with? Most men act though?
If the product of three consecutive int is 210,then sum of the two smaller ints is:
A can have a piece of work done in 8 days, B can work three times faster than the A, C can work five times faster than A. How many days will they take to do the work together ?
If the bus travels with 8 tyres(6 tyres running),travels a distance of 16000 km how much is the distance sustained by each tyre.
new town is straight to the north of new york. A high way m runs from newtown making an angle of 61 degree south east. From new york there is also an high way n which runs northeast 61 degrees. If high ways m and n are straight then find out the acute angle made at their intersection point.
When DB2 is run in IMS environment an application can access data in a) Only DB2 database b) Only IMS database c) Both DB2 & IMS databases d) None of the above
In a soap company a soap is manufactured with 11 parts. For making one soap you will get 1 part as scrap. At the end of the day u have 251 such scraps. From that how many soaps can be manufactured?
Complete the series:5,6,7,8,10,11,14,__.
Find the missing number in this series? 8 2 14 6 11 ? 14 6 18 12