Write the Testcases for Telephone
Answers were Sorted based on User's Feedback
Answer / senthil kumar
1. Check for the specifications which are recommanded for
(like phone's size and color, no. of buttons and its size).
2. Check for the buttons working status.
3. Check for the logo printed on phone
4. once connection is given dial tone should be there
5. Telephone internal connection must be fine
6. Telephone must be Checked(Mark of Tested)
7. Telephone should have facility to Increase or decrease
of ring volume
8. we should recieve msgs from other end once the
connection is given
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / jagadeesh
I think some kind of lazy interviewers throw this knid of
non-sense questions. It is very clear to everybody that We
do not go for testing until we are clear with each and
every piece of functionlity. In this scenario they throw
open-end questions like this and want to see the fun that
is going to happen. Questions like these put the tester to
more pressure. They force us to assume something about the
shit and expect some kind of miracles in terms of
testcases. So drill him on telephone with question.
Thanks
Jagadeesh
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / ramesh
The best way is, that if there is any telephone on the
interviewer table, just pick it up and throw it on his face.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / hari
You are 100% Correct Jagadeesh!!!
But Testers are being faced these type of quite often.
How to face them
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / talluri
i agree with u ramesh, but sometimes itsn't write
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nagendra prasad
Great answere Mr.Ramesh.......... I agree with that....
| Is This Answer Correct ? | 0 Yes | 0 No |
Hi, Below is a question on white box testing. Kindly help me in answering it. How many test cases are needed to obtain 100% branch coverage. This question was asked in ISTQB foudation level exam - Dec21 2008. Read(A,C) If(A<10) then Print A; Endif If(C>100) then Print C is greater then A else if(C<100) then print only C Endif else Options - a. 4 b. 3 c. 2 d. 1 Kindly answer with explanation so that it would be easy to understand
what is endurance testing?give one example
If planned effort and actual effort is same, then how to calculate the effort variance ??
which testing is done first smoke or sanity with an real time example plz?Thank u!
1. WHAT IS BPT? 2.. WHAT IS THE BUILD VERSION? 3.. WHAT IS ECP? 4.. WHAT IS BOUNDARY VALUE ANALYSIS?
What should be done after writing test cases?
Are number of defects more in design phase or coding phase?
What are all the netwoking tools, hardware tools and software tools required for testing a web-based n client server applicatopn?
This is a interview question i faced? Suppose your client doesnt have any idea abt software or the technology ?then how
Can any one explain the all types of testing in detail with aim of the testing,purpose,Person Doing,entry criteria,exit criteria,Documents required.....its very helpful for me..if possible send it to my mail id varalaruu@gmail.com
Good testing tools institute in Bangalore?My name is Vishal V
how testing is carried out in real time agile methodology i mean to say how a job is assigned to one tester in a team