Answer Posted / senthil kumar
1. Check for the specifications which are recommanded for
(like phone's size and color, no. of buttons and its size).
2. Check for the buttons working status.
3. Check for the logo printed on phone
4. once connection is given dial tone should be there
5. Telephone internal connection must be fine
6. Telephone must be Checked(Mark of Tested)
7. Telephone should have facility to Increase or decrease
of ring volume
8. we should recieve msgs from other end once the
connection is given
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what type of testing techniques are using after accept the build?
What is the purpose of test strategy?
1.Enlist the types of testing performed for any window in sequence? 2.Use of edit_get_list function 3.Accuracy & Precision
Wat type of questions ll be asked in interview for an 1-2 yrs. experinced persond and i need some database concept question in testing.
tell me 5 new requirements in ur project? plz urgent
hi friends i recently finished testing course in hyderabad.now am looking for a job in uk.i need help about the projects in interview point.can any one explain me abt banking project or credit card.like what are the problems faced in u r last project etc.
how to explain banking domain project in testing?
. Is any graph is used for code coverage analysis?
What is the main use of preparing traceability matrix and explain the real time usage?
Have you prepared traceability matrix and how to prepare it?
What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.
Can you explain usability testing?
What is change request, how you use it?
How to do Performance Testing manually for a Flash Application?
What r the sequences that leads to automation?