Explain the working with task in Gantt chart view.
Answer / Yashveer Singh
In Gantt Chart View, a task represents a specific piece of work that needs to be completed within a project. Each task is displayed as a horizontal bar on the chart, with the length and position indicating its duration and start/end dates. You can assign dependencies between tasks, set progress, and view critical paths for better project management.
| Is This Answer Correct ? | 0 Yes | 0 No |
reading lines from a file by searching a word(instr) and copying to other textfile,but its only copying only one line but there are some other lines match criteria but not copying to the files
what is the Property used to count number of items in a combobox?
How can you get selected file from file system Control?
Name the four different cursor and locking types in ADO ?
What is the difference between modal and module-less window?
What are the different cursor types that can we create using ADO Recordset? Difference between these cursor types?
What is a Type Library and what is it's purpose ?
OLE is used for _______
what is the Max size allowed for label caption length?
Can we change back color of command button control? if yes than how it is possible?
How can we find out that a recordset is blank (without using recordcount property)?
Using which type we can access file line by line?
Visual Basic (800)
C Sharp (3816)
ASP.NET (3180)
VB.NET (461)
COM+ (79)
ADO.NET (717)
IIS (369)
MTS (11)
Crystal Reports (81)
BizTalk (89)
Dot Net (2435)
Exchange Server (362)
SharePoint (720)
WCF (340)
MS Office Microsoft (6963)
LINQ Language-Integrated Query (317)
WPF (371)
TypeScript (144)
Microsoft Related AllOther (311)