Question 95 - The following formula is used as a reference : (analyte signal) / (internal standard signal) = (f-factor) x (concentration of analyte) / (concentration of internal standard). A solution containing 3 mM of analyte and 4 mM of internal standard gave peak signals of 2 and 3 mamps respectively. Another similar solution containing 2 mM of analyte and 1 mM of internal standard gave peak signals of 1 and 4 mamps respectively. Find the average f-factor.
Answer 95 - Let (f-factor) = (analyte signal) (concentration of internal standard) / [ (internal standard signal) (concentration of analyte) ]. For first solution, (f-factor) = (2 mamps) (4 mM) / [ (3 mamps) (3 mM) ] = 8 / 9. For second solution, (f-factor) = (1 mamps) (1 mM) / [ (4 mamps) (2 mM) ] = 1 / 8. Average : Average f-factor = (8 / 9 + 1 / 8) / 2 = (64 + 9) / (72 x 2) = 73 / 144. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
Is This Answer Correct ? | 0 Yes | 0 No |
Handpump harness water dont go back.Why?
What's is the mechanism of for stroke engine
Basic questions asked in HPCL(instrumentation) in refinery section
what should be the recommended BDV of an oil transformer???
Question 95 - The following formula is used as a reference : (analyte signal) / (internal standard signal) = (f-factor) x (concentration of analyte) / (concentration of internal standard). A solution containing 3 mM of analyte and 4 mM of internal standard gave peak signals of 2 and 3 mamps respectively. Another similar solution containing 2 mM of analyte and 1 mM of internal standard gave peak signals of 1 and 4 mamps respectively. Find the average f-factor.
explain ht breaker in a detailed way??
How can u find reactive loads(Kvar)?
What is the full form of cable type-ayry
What is the neutral voltage in practical AC systems
i want to design tap changer for 15kv to 0.4kv steepdown transformer then how can i calculate tap number required
i want MEIL placementt papers
In an existing power plant (phase I) with step up transformers (3nos) with Ynd1 vector group to the 400KV bus bar,an extension power plant (phase II) with transformers (4nos) with Ynd11 vector group >. what are the consequences of such configuration ,please note that % impedance are also differ i.e. 15% & 10.5% the reason was that auxiliary supply interface is at different voltage levels i.e 400v & 6.6KV in phase i and phase II respectively .please advise ! Thank you !