Question 95 - The following formula is used as a reference : (analyte signal) / (internal standard signal) = (f-factor) x (concentration of analyte) / (concentration of internal standard). A solution containing 3 mM of analyte and 4 mM of internal standard gave peak signals of 2 and 3 mamps respectively. Another similar solution containing 2 mM of analyte and 1 mM of internal standard gave peak signals of 1 and 4 mamps respectively. Find the average f-factor.
Answer Posted / kangchuentat
Answer 95 - Let (f-factor) = (analyte signal) (concentration of internal standard) / [ (internal standard signal) (concentration of analyte) ]. For first solution, (f-factor) = (2 mamps) (4 mM) / [ (3 mamps) (3 mM) ] = 8 / 9. For second solution, (f-factor) = (1 mamps) (1 mM) / [ (4 mamps) (2 mM) ] = 1 / 8. Average : Average f-factor = (8 / 9 + 1 / 8) / 2 = (64 + 9) / (72 x 2) = 73 / 144. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the total power generation in india?
how to control dc motor?
What is meant by retrace time?
how did you spend today
Tell me what if you have a garment or fabric that is half or less polyester and the other portion a natural fiber (like cotton), you can try using the reactive dyes?
How can metals be removed from aqueous waste streams?
WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL
WHAT IS THE WINDING PROCEDURE OF ELECTRICAL MOTOR
I am refused L1-B visa filed by my employer on May 09 by US consulate Chennai. When i am eligible to apply L1-B visa again through my employer?
How can we calculate the efficiency of a Running (On-Load) Motor ? What parameters are required and what is the method ?
What you mean by multi stage control vavles?
How to calibrate Magnetic flow Transmitter in Field
what is actual drum level and compensated drum level?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir