What is Ramp up? How do you set this?
Answers were Sorted based on User's Feedback
Answer / mahesh sv
This option is used to gradually increase the amount of
Vusers/load on the server. An initial value is set and a
value to wait between intervals can be specified. To set
Ramp Up, go to ?Scenario Scheduling Options?
Is This Answer Correct ? | 14 Yes | 1 No |
Answer / lucky123
It is one of the part in the scenario creation. it
describes about how vusers are entering into the
scripts.(i.e every 2 users at every 10 sec)in controller
there is one option called scenario scheduling.thr this we
can set this.
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / pravash0000@gmail.com
Ramp up:how the user log into the system.
in controller schedule scenario real world scedule-start vuser
in this option we can give vser and duration in ramp up
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mohan
it is the way of increasing the load gradually.again it
depends on our application.we can do it in controller,in
that global schedule is there , there v can set ramp up
Is This Answer Correct ? | 1 Yes | 2 No |
What is ramp up and ramp down?
I have one Scenario login then bookcoffee then logout explain test plan for above scenario?
which language is used for load runner script?
Hi all, I am new to Load Runner. I have run the load runner and i got analyzed reports/graphs. But i am very much confused about how to analyze those graphs. Can any one help me out this problem?
Which documet will gives us information about rampup and duration for each transaction? Technically speaking Which document gives us information about Transaction Mix?How do we prepare Transaction Mix?
What does vuser_end action contain?
Hi anyone please share the load runner error messages
If web server, database and Network are all fine where could be the problem?
During the load test, what is the optimum setting for logs?
how can we record the Ajax Script, when some of the validations devloped in AJax using Loadrunner 8.0. I know there is separate protocol in LR 9.0
If you want to stop the execution of your script on error, how do you do that?
If you had 6 hours of load testing to complete but the business unit wanted it turned over in 3 hours what would you tell them?