Select testplan tab in the testdirector and selecting the
option run all.

Is This Answer Correct ?    5 Yes 1 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / preeti

Click on the Run test Set under Test lab in that you have
the option of runnung the test Automatically or manually,
you can either select all test to run or just 1 test.The
run can be done Locally or remotely...by creating a host or
adding new host in the list.Please use the user Guide for
further details.

Is This Answer Correct ?    2 Yes 0 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / ramarao

click the run test tab,after that click on tset set builder,
u can set wt testcase u can require for running, take on
keep into one folder after taht wt testcases u have
required for runnning ,all of them put in same folder wt
ever u want.After that u can click on run tab it will be
executing.

Is This Answer Correct ?    2 Yes 0 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / sahana

use RUN TEST SET on test lab tab....this might help...!!!

Is This Answer Correct ?    3 Yes 2 No

HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXA..

Answer / nitin taneja

Automation tool has to be used...for this purpose u have to
have atleast one automation tool like winrunner or qtp
installed on ur server....after u write test cases for a
test in TD u can automate them (generate a test
script)....after that include all the test that u need to
run under one test set. then the tests need to be scheduled
by putting a time and date stamp to them so that they run
at ur desired time....click the run test set option under
test lab and choose the run all test option in the
execution dialog box.....the tests go into waiting mode
till the server time matches the predefined time for tests
that the user provided and then the execution starts!!
tada!!

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Test Director Interview Questions

How to fatch data from excel sheet using TEST DIRECTOR

3 Answers   Kforce, L&T,


yesterday night u r giving some scripts to run and u r going to home again today morning u r come to office then how u r check the result in Test Director (TD)?

1 Answers   Ordain Solutions,


What is test set?

6 Answers   Ordain Solutions,


can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released

0 Answers  


What is the main purpose of storing requirements in test director?

0 Answers  






What is the Change management ?

0 Answers   MicroGenesis,


what is the Extra tab in QC ? Explain me?(Suma)

5 Answers   CTS, TCS,


How to send autogenerated mails to concerned 1 when a new defect is logged ? 2 when defect status cahnged e.g from open to closed?

4 Answers  


what is test bed in terms of software?

3 Answers  


HOw to map testcases with requirements in test lab?

3 Answers  


HOW TO RUN SEVERAL TESTS AT A TIME USING TEST DIRECTOR ? WITH OUT USING AUTOMATION TOOL? (FOR EXAMPLE IF I GIVEN 20 TESTS TO TESTDIRECTOR FOR RUNNING PURPOSE IN TODAYS NIGHT I WANT TO CHECK THE TEST RESULTS NEXT DAY) HOW TO DO THIS ?

5 Answers   CTC, CTS, HCL, Perot Systems,


Can u link the logged defect to the perticular requirement in QC just as we can map TCs to requirements in QC.

2 Answers   CybAge,


Categories