Hi all,
Currently i have completed 2 years in Accenture@manual
testing. i have ISTQB CTFl certification too. I have fair
idea on J2EE programming too. I have basic knowledge on
mainfreame testing and QTP also. So with these skills how
much package will be offered if we opt to switch the
company...Please suggest me folks
Answer / pawan
Hello I don't know the answer of your query because i'm not on senior level.
But i need a help from your side. Can you please mail me the question which can be asked in MNC for 2+ years in manual testing.
Thanks in advance. Please share on sonu.lucky9999@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the advantage of V-model compared to other models?
diff b/w smoke and sanity testing and what is migration plan in testing?
can u tell me some bugs in any banking application.
What is an IDE?
what is static and dynamic testing.
In Test Case Document, Expected Result and Verify are the same fields?
Configuration Management is 1)before System Requirement 2)at Start of the S.D.L.C 3)at Start of the S.T.L.C 4)at the time of Coding. Would be better if anyone can provide some explanation for the answer
Tell me the scenario where sevirity More and Priority Low?
Did you have access to all the modules(Requirements, Test plan,Test Lab, Defects, & Dashboard) in Quality Center(QC) or only to some particular ones?
what is deffered defect?
with what documents you prepare the test cases? (Asked in Zensar Hyderabad today(17-1-12010))
If you find a bug and the developer says it is as-designed, what can you do?