can you explain aim methodology, what are the documents need
to be prepare as functional consultant, explain about gap.
Answers were Sorted based on User's Feedback
AIM provides the Basic Outline with which the whole
Implementation Process needs to be handled after the
Contract to Implement the solution is signed with the
Customer. This has so many steps, documents and Templates
and the Implementing Company can decide on which are the
steps, documents and templates to be used
Steps
Definition: ---Conduct current business base line—RD-020
--Develop high level process design—BP-70
Operational analysis --Gather business requirement RD-50
-- Develop future process model BP-80
-- Map business requirement BR-30
Solution Design -- Define application setups --BR-100
-- Develop system scripts -- TE-40
Build -- Perform system testing TE-110/120
Transition -- Perform acceptance testing TE-130
-- Begin Production -PM-80
Production
| Is This Answer Correct ? | 16 Yes | 0 No |
Answer / saiyid maududi
The documents you prepare for going forward projects are.
MD050, MD060, MD070, CV40, TE040, BR100, BR110 etc.
| Is This Answer Correct ? | 0 Yes | 0 No |
What is gap analysis, how do you defined?
When does the Invoice price variance arise? What is the accounting entry?
how to transfer the Invoices entries from AP to GL, can any body give the answer
3 Answers First Indian Corporation,
While setting up the cross validation rules is it necessary to enable the SECURITY RULE check box along with CROSS VALIDATION RULE check box in flexfield structure. plz clarify my dt
Hi, Friends i need some Accounts Payable, General Ledger, Cash Management study material. Please if u have some material kindly send to my id itsaqueelahmed@gmail.com. i will be very thankful to u .
1. P2P cycle with which accounts get effected at each stage
2 Answers Apps Associates, Meru Cabs, Patni,
What are the matching Po options in AP Invoice Workbench and what is the different b\w them?
Why do we use Check Positive Pay ?
Is Multi Org. setup is mandetory or optional?
I am created credit memo in at but while trying to complete it showing error message-hz_party_location
What is the Customization? Can any one tell me with examples in Real time scenarios?
What could be the probable reason for Not Showing the Taxes in Project Draft Invoices?