what are the general difficulties which u will be facing while
doing web based testing and desktop based testing.



what are the general difficulties which u will be facing while doing web based testing and desktop..

Answer / lakshmanaraj bg

Ya there is some difficulties which i faced while doing web based testing and desktop based testing.

The difficulties is while preparing or generating report for the particular web site it takes too much of time.

It is very tuf to collect all the URL's of the web site and we have make report in excel sheet.

The web site has 264 functions. For that i prepared report with 264 URL's and for each action i have given a separate explanation for each URL.

But according to my view while doing web based testing and desktop based testing we will be face some sort of difficulties. But it's nature of testing.

As a tester we have to face such a difficulties and we have to over come the same.

Thus, testers are plays an important and vital role on it.

Is This Answer Correct ?    2 Yes 6 No

Post New Answer

More Manual Testing Interview Questions

Explain stress.load,performance and volume testing with example..

1 Answers  


What parameters are you testing for as a Systems Tester ?

1 Answers  


What is Web based testing? How do we test web application manually in real time? Is there any procedure to do this testing? real timers plz reply me...

2 Answers   ABC, Wipro, Arsin Systems,


How to write a scenario from requirements?give an example..

3 Answers  


What is the relationship between quality and testing

2 Answers  






What is difference between system and functional testing?

2 Answers   IBM,


how many meeting in realtime environment? what are they?plz explain?

0 Answers  


Can any one tell me the contents in Traceability Matrix

4 Answers   IntraLogic,


what is Adittrail in test factors

1 Answers  


what is traceability matrix ?what is use of that matix ?

3 Answers  


Which is not formally included in Test Plan? 1)Features to be tested 2)Incident reports 3)Risks 4) Schedule Pls reply .Thanks

9 Answers   HCL,


You need to plan a test project to qualify an application composed of many individual components. Referring to the scenario above, which phases do you expect to take longer than usual?

2 Answers  






Categories