1.what are disadvantage of V model?
2. In V model two phase is there. That is verification and
validation.1St phase is verification , why it is called
verification?
Answers were Sorted based on User's Feedback
Answer / balu
Testing During Development is Called as verification
because in this phases will do only reviews of each pahse
not actual testing. where as Testing After Development is
called as Validation where actual testing is done
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / k reddy
this process(verification)mainly doing before coding so
this verify the developed project/product without excution
this verification doing entire v model
| Is This Answer Correct ? | 2 Yes | 5 No |
How you test a product if the requirements are yet to freeze?
What we normally check for in the Database Testing
What is Memory Testing> Do you perform ever memory testing on Desktop or Web application ?
How should your staff be managed? How about your overtime?
Hello can any one help we which certification is can be taken is it ISTQB or CSTE ? How to prepare for the exam & where we can find the materials etc for the prepartion? Please Help me. Thanks in advance
if you have a test cases please send me on singhajay7786@gmail.com thanks in advance.
what is agile testing
what is the use case and what is the test case?
what are the typical problems in web testing?
what is meant by system testing? what is functional testing? what is the difference between both of these testing? can anyone explain this in detail?
Suppose there is a User window (having fields First name, Last name, phone & address) What is the test case for Edit User ?
Can you tell me what is negative testing?