Answer / nik
hi chandra shekar
i think SRS means Software Requirement Specification..!
| Is This Answer Correct ? | 7 Yes | 1 No |
srs...means software or system req'd specifications.SRS
gives an overview or complete details of the customer
requirments....based on vch we develop our functional specs
& usecases.Design documents consist of 2 types HLD &
LLD...wher as HLD specifies the xternal design of the
app...aher as LLd defines logic o every sub-module vth
detailed front-end & back-end..3) when the new build is
received n 2 d testing environment..the Project manager &
team lead decide based on d functionality & man-power who
to take what...!!
i think this is wat itz........well if im wrong plz correct
me!!
| Is This Answer Correct ? | 6 Yes | 0 No |
SRS is basically organisations' understanding of customer
requirements and dependencies for a particular point of
time prior to any actual design or development work. It
provides input to the development team to design the
project. It provides input to the testing team for
validation check.
Contents:
--------
1. Introduction
1.1. Project Overview
1.2. Scope
2. Existing System
3. Proposed System
3.1. Project System
3.2. Project Archetecture
3.3. Automation
4. Requirements
5. User Management
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / saff
srs means system requirment specification -this doc
describes the whar r needed for turning cust req into a
s/w
scope of the project
goals and objective sof project
functional requriment
non function requiremnt
conditions
assumtions
use cases
interface requirment
and lot more to be included
as tester point of view we r conserned with functional
requirment so that we can validate them
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / shiva
Yes, what the sharath provided is perfect.
SRS will be prepared by BA (it may be the exact BA or the
guy who acts as coordinator for the project from our end to
customer) people by the understanding the requirements of
the customer
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / lokesh chauhan
K.Chandra sekhar,Shankar,Nik answers are worng Sharath
answer is 100% right so go wth Sharath's answer thanks
Sharath
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / k.chandra sekhar
a) The SRS is nothing but special requirements
specification that is the must wanted the customers
requirements.
b) In SRS have totally customer requirements and it
must and should
c) So the SRS is very important of the tester point of
view
d) Based on the SRS prepare the HLD and LLD
e) The above the HLD and LLD prepare the design
specialists
f) New build is nothing but the add the some extra
requirements
g) It is already developed by the developers but
terser test after add some extra futures
My name is k.chandra sekhar
My phone no is 09246540049
I am in hyderabad
My mail id is ndra_143@yahoo.co.in
If any body want full explain send that mail
| Is This Answer Correct ? | 3 Yes | 9 No |
As a tester how we resolve defect leakage? And how it occures?
What are all the documents you are going to submit at the time of release as a testlead?
Hello everybody, How many people do you think one sprint team can have in average?
What are the basic concepts of database that a software tester should know?
What is the difference between client server and web based testing?
What is Testing Life Cycle?
what are the add-ins needed to test .net and c# projects?
What is Traceability Matrix? How will you exactly map it and in which stage will you prepare that?
What is suspension & resumption criteria in Test Plan please explain with example ?
What is the difference between test case result and a bug?
which is the best institute for testing in hyderabad?
If anyone have attended interview with deloitte for the post of senior manual test engineer. Please share the interview process and the questions asked. How to prepare for the interview. Thanks in advance