Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what do you mean by defect,error and bug????

Answers were Sorted based on User's Feedback



what do you mean by defect,error and bug????..

Answer / alston paul

BUG - TESTERS FIX THE BUG WHEN RESULT MISMATCH WITH EXPECTED
AND ACTUAL RESULTS.

DEFECT-DEFECT MEANS ERROR IN LOGICAL MISTAKE BY NOT MEETING
THE REQUIREMENT.

ERROR-ERROR MEANS AN PROBLEM IN CODE LIKE (RUN TIME ERROR,)

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Manual Testing Interview Questions

write testcases for keyboard

1 Answers  


1. fault based testing is reversed of which testing? option.1 conventional software testing Option 2Operations and classes that are critical or suspect Option 3 Use-case validation Option 4White-box testing of operator algorithms 2. Testing OO class operations is made more difficult by Option 1 Encapsulation Option 2 Inheritance Option 3 Polymorphism Option 4 Both Inheritance and Polymorphism 3. Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning 4.Client/server architectures cannot be properly tested because network load is highly variable. Option 1 true Option 2 false 5. Real-time applications add a new and potentially difficult element to the testing mix Option 1 performance Option 2 reliability Option 3 security Option 4 time 6.Which one is not key term used in internal control and security Option 1 Threat Option 2 Risk Control Option 3 Vulnerability Option 4 Exposure 7.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products. Option 1 true Option 2 false 8.Static testing requires...? Option 1 Binaries Option 2 Source code Option 3 Product Option 4 Executables 9.etesting is testing the application with multiple sets of data is called retesting Option 1 true Option 2 false

2 Answers   Infosys,


diff b/w waterfall model & spiral model?

14 Answers   APIIT, BBD, QQ, Rift Valley Institute of Science and Technology RVIST, Wipro,


Is the regression testing can call it as Retest

7 Answers   Wipro,


1) I have 5000 test cases within 3 working days u have to finish? How you will handle it. 2) Difference between Relase-1 and Relase-2

1 Answers   Target,


what is meant by Priority and Severity?

2 Answers   Crea,


A 2 different developer design same function. After both completed. In testing engineer how do test that function?

1 Answers  


who provides the test data in ur company?

2 Answers   Accenture,


What is confirmation testing? Different between regression testing, confirmation testing and unit testing?

1 Answers  


One very small question, If application/ website performing all the function perfectly like submission, deletion, editing etc, why do we require Data base testing saparately. Please understand before reply thanks !!

3 Answers   Adobe,


what is agile testing, explain with example

9 Answers   Mastek, Wipro,


i want to for technical interview question paper along with in tesrviwe Phases i need

0 Answers  