which are the different types testing tools are available
and which tool is mostly used in industry

Answers were Sorted based on User's Feedback



which are the different types testing tools are available and which tool is mostly used in industr..

Answer / prashant

winrunner
qtp
load runner
silk test
rational robot

qtp is used nowadays in most of the firms

Is This Answer Correct ?    3 Yes 0 No

which are the different types testing tools are available and which tool is mostly used in industr..

Answer / narandra

1)Functional Testing Tools (QTP,Win Runner),
2)Performance Testing Tool (Load Runner),
3)Java Testing Tool (Jtest),
4)Embedded Testing Tool (Test Quest),
5)Data Base Testing Tool (SQL DB).

E.T.C......

Is This Answer Correct ?    3 Yes 0 No

which are the different types testing tools are available and which tool is mostly used in industr..

Answer / chabs

QTP: for functional testing is used most
Load runner: for performance testing...

other functional testing tools are
winrunner(older version of QTP), Silk, RFT(Rational
Functional Testing),Test partner, Selenium,Watir, Watij,
http unit....

Some of the performance testing tools are
Load runner, QA load, e-load, open-STA, Silk performer,
RFP(Rational Performance Test), WAS(Web Application Stress
Testing tool)...

XENU- link testing tool, A-Prompt and Infocus are Acceptance
testing tools, VSS-Version Control Tool etc!

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Manual Testing Interview Questions

What is Adhoc testing?

10 Answers   4Cplus, Mind Tree,


what is the format of traceability matrix u prepared in ur company?

3 Answers  


Hi frnz!! Can we do the Testing without writing Test Cases, but only posting the bugs in the BMS?

14 Answers   HCL, JPMorgan Chase,


Hi all, I am currently working in manual testing and am interested in database testing. How do I change my career from manual to database testing? What are the prerequisites for that inorder to equip myself for database testing?

3 Answers  


Does anyone have any good examples of some acceptance criteria for non-functional requirements?

0 Answers   IBM,






what is meant by application server and its functions?

1 Answers   GE, Verizon,


tell me some major and minor defects in ur net banking project?

0 Answers   Accenture,


As a tester I found a show stopper(critical defect) this evening whereas the project is going to be delivered to the client tomorrow morning so there is no time left.I reported the same to my test manager but he is not ready to convinced with me moreover he wants to close the matter as it is....in this senario wat will u do???

3 Answers   SuperValu,


What would u do if u come across a bug...report it.....but the programmer is in a diff location ( say u in India n he is USA)..and he keeps accepting its a bug?

3 Answers   AZTEC,


Difference between the HotFix,ShowStopper and critical bug?

5 Answers   Infotech,


Write down ten test cases for below scenario: Increase the day by 1 and date format should be mm/dd/yyyy Conditions are : date should not be greater then 31 and date<1 month should not be greater then 12 and month<1 year should not be greater then 10000 and year<1 Thanks in advance

0 Answers   Wipro,


Explain The test development life cycle?

1 Answers   Crea,


Categories