What is Rekey Defect?
Answer / ravikanth
An issue is something happening currently, a risk is
something that might happen in the future.
An issue is not risky, it is just something unfavorable. It
has little or no effect on the scope, the budget, and the
schedule of the project. A risk, on the other hand, can
have drastic effects on the triple constraints if not
managed properly.
| Is This Answer Correct ? | 8 Yes | 11 No |
what are the reason for assigning the status Postponed and differed to a bug? Pls tell me with exampless
I m having SRS.In Manual Testing,how am I going to decide whether to pass particular test case or not from that SRS??
Give proper Seq. to following testing Types Regression, Retesting, Funtional, Sanity and Performance Testing.?
i have 500 testcases , how to perform the regression testing
1)what are techniques used for writing the Test case?
How do we validate cerdit cards in billing project
how u will write test case for system testing give me example
what is the entry criteria and exit criteria of integation testing.
Describe the basic elements that you put in defect report?
6)If a project produces 1000 defects per 150 function points, then it is a: A)Baseline B)Benchmark C)Size D)None
what r the test cases of SMOKE,FUNCTIONALITY,REGRESSION for LOGIN PAGE. how do u check it
can we directly write test cases in test directory.