why VCB always installed only at HT yards or HT side? suppose if ACB installed at there means, what will be problem?
1 7375what time should we set to come on star contacter in stardelta starter?and for what reason we hav to set such time delay range?
2 5334What type of input will the OLTC indicator will accept or what type of output the OLTC will produce to monitor it's position at remote location.
amps,
1 3926What is the minimum setting in REF relay because i am facing some problem whenever power resumes after power failure my transformer is tripping because of REF trip. I am using CSPC make numerical relay(DIP switches). Now setting is 15 percentage. What is the reason for this triping. I sm waiting for answer
2 4901when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.
2012Post New Electrical Engineering Questions
any one please tell taht what type questions will be asked in BHEL interview, i am having interview on 24th Dec, please send this to mail pradeepsistam@yahoo.co.in
Why is voltage is required to be within permissible range for an electrical equipment?
I am experienced with house and industrial wiring but I don't have any licence how can I apply an licence and which type of licence i can get i didn't complete deee just only experience
Meaning of ingrace protection for motor.for ex IPXY
Explain how you can give the overload setting to any Motor Protection Relay for a HT motors with formula and example?
why swinburnes test cannot be performed on series machines?explain
Why AC & DC capacitor are use in UPS ??????????????????
If we impress a dc voltage of 230 V on an unloaded 230 V, 50 Hz transformer it wi A give high secondary voltage B burn out C give secondary voltage as per K D none of these
what is the difference between online & offline caliberation of KWH meters. Can Digital meters be caliberated
why ahould you show client/engineer activities clearly on the project plan
how is working bearing heater?
What is the function of retrip in busbar?
how we decide the require size is this for a known current at fuu load?
What is error of a measurement?
how to select energy meter? have any calculation?