we have 3 single phase transformers. how will we generate 6 supply from 3 phase supply input
NHPC,
2120i have applied for the post of RRB section engineering chennai board please send me previou papers and solved answer. my mail id jagarapusrinivas@gmail.com
RRB,
19741. what is the meaning of bus? 2. what is the dc transformer? How it work 3.what is the function of the serge absorber? 4.How the CT and PT rating calculate/
1 5928How we can calculate the Amps for the cable Ex:- For 1sqmm wire how many amps we can draw (calculation)
TATA,
3192suppose we using 3 phase motor of 440 v means what range of C.T. is require for measuring current ?
9 11893Iam deepthi.i completed my b.tech from electrical engineering.i want to prepare for civil services.i dont have much knowledge about these exams,but i have great zeal of cracking exams.plz provide me suggestions to which options i can select for optionals
7 9729i want to know is it possible to generate usefull power by coupling generator with motor & supply gives to motor by battery source then generator generates power. remove the battery source given to the motor & feed the supply from some of the generated power supply to the motor & motor runs continously. generator generate power contnously.is it possible ?
5 8335will the turbogenerator operate on leading power factor with out modification in the stator winding.
3 9010suppose we using 3 phase motor of 440 v means what range of C.T. is require for measuring current , the rating of motor is 1HP ?
5 9858Post New Electrical Engineering Questions
What is the rating of circuit breaker needed for 300 KVA load in 33 KV supply line in a transformer of 33 KV / 415 Volt ?
what is negative d.c. voltage, why this voltage is used in base transciever station.
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
Define de-sensitivity?
What is the function of a neutral reactor.
what is the total power generation in india?
draw the block diagram of fire alarm?
ho can we calculate the conductor insulation value according to their ratings like voltage,current etc.how insulation value related with voltage,current and power of amachine
How do we find the rating of a transformer, if it got burnt badly.
how to minimize earth resistance upto 2Ω, if the resistance is 6 Ω ?
is there any role of power factor with frequency variation? and how we can manage the frequency variation?
design a 3 bit synchronous and asynchronous counter using T- flipflop
3- What is the target from Zero Impedance, Single Phase Imp., S/C Imp. and magnetic balance tests?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
WHY THE RATINGS OF THE TRANSFORMER IS 33KV WHY NOT OTHER???