A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
1750Post New Electrical Engineering Questions
what is the correct method for the outdoor termination of 19/33 KV HT cable step by step?
Why is better to have a minimum ceiling voltage of 250% than 160%?
What is grid collapse? what is the reason for it?
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
it is possible to measurement of tension of slipring induction motor(SRIM)carbon brushes, any maesuring instruments are available in the markets.
how to calculate micom relay earth falt time and current sertting
What is gain margin?
When color of silica gel will gets change from blue to pink from Top to bottom?
please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com
Why phase sequence must be same in any ht motor or generator circuit?if phase sequence doesn't same whatever will be affect on circuit?
what is ic 01,ic 06 ?is it types of cooling?
A 1F capacitor is charged to 100V initially. A 1H inductor is connected accros the capacitor througha a switch. The current in the circiut when the switch is closed is____
What aturn on methods of scr?
what is the profesional board for electrical engineer what is thepast and during construction for electrical engineering
What are the specifications for conducting earth leakage test as per IEC standard?