How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
1 3118If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
1312How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
CDPL,
891what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
963For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
865For 100 bag cement how i will calculate sand and metal aggregate.Mixing proportion 1:1.49:2.38
1 1288Post New Civil Engineering Questions
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Describe a time when you anticipated potential problems and developed Preventive measures
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
I have an span length 16 ft c/c
How can I make justification between using concrete grade c35 compare c37?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
why development length = 50D . why not 100D
Explain what is zoning permit?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
In jack arch floor, the rise is kept?
how to calculate the length diamond shaped striupps in column