What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
2295what is the slump of pile concreting work? give me the value of minimum and maximum value of slump and how give slump in pile?
3 7743How much quantity of steel will be used for commercial building consists of ground floor shops, first floor shops, second floor will be for offices and third floor will be office/banks. How many tons of steel is required to construct this building.
CRPF,
3 7201How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
2087Post New Civil Engineering Questions
How to design staircase.plz tell me formula for the design the staircase.
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
IS code for Rolling Margin of steel
What is the origin of name railway sleepers?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
acceptance criteria for concrete works
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
Is it possible to make a feature using an overdefined sketch?
Slump Values for works?
What is OSHA compliance?
What is meant by cartesian coordinate system?