Whats meaning of DBD in soil subject

3 3344

Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice

1324

how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg

2 8114




how to calculate the quantity of plaster.

DB Realty,

3 5961

how to check aggregate quantity in stock yard

1 3501

LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

746

what is the purpous of using m50 grade concrete ? why its using ? what is the difference between m50 grade concrete and other grade concrete ? uses of m50 grade concrete?

1 4021

what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc

2 20213




DEFINE M30 GRADE CONCRETE. FROM THIS QUESTION WHAT; "M" & 30?

Descon, Northstar Homes,

7 28985

How to calculate the length of chairs provided to support the top rebar in concrete foundation

L&T, TCE,

2 20640

in coarse stone masonry(bela masonry),how many cement bags are used in cement mortar for proportion 1:6

2 3007

what is superbuilt-up area in flats & how it is calculate?

5 4742

Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

NTPC,

1015

WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?

3 2904

WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?

846


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

801


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

3848


for pretensioning which will yield first and same for post tensioning?

834


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

949


How to arrive d*d/162 , for finding the kg per meter , wt of steel

473






std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

791


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

1463


I want to join bhel because

1020


WHAT GOAL DO YOU HAVE IN YOUR CARRIER?

1008


Why should you consider yourself fit to be hired by jindal steel.

2702


What do we mean by partial moment release ??

2531


trapozidal

1151


What is the use of water table & Kreb stone for drain

600


What is Grid floor and mention its advantages ?

1558


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

699