Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
2164LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
1577what is the purpous of using m50 grade concrete ? why its using ? what is the difference between m50 grade concrete and other grade concrete ? uses of m50 grade concrete?
1 5460what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc
4 54812How to calculate the length of chairs provided to support the top rebar in concrete foundation
2 31006in coarse stone masonry(bela masonry),how many cement bags are used in cement mortar for proportion 1:6
2 4572Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
NTPC,
1764WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?
3 4635Post New Civil Engineering Questions
what is civil engineer greatest strength and weakness?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What are the responsibilities of a site manager?
How we calculate the service time of buildings
what is the construction cost for per cft of multistorryed building in kolkata?
how to create our resume?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Which ratio use for cement selery???
What are the different methods for drawing an arc?
What is oneside mat. And explain
silt%= silt volume/ silt+sand volume is this right?
"Gates of the dams are generally designed of curved shape". Why?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?