what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?
2 5199How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.
3 12264what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
2503As per IS 456 2000 Clause 16, table 11, page no. 30, it is written that acceptance strength of concrete is fck+4 for grade above M20. what is the meaning of " Mean of the group of 4 Non- overlapping consecutive test results"
1 6655How to calculate the force on a column of three story building. What should be the base concrete height?.
C&C,
2309what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
2337Post New Civil Engineering Questions
what does the grad of cement shows (denotes)?
IS code for grade of concrete for bamboo lintel????
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
how much cement and sand required for 100sqm of wall plastering in different proportions
How can you achieve soil enforcement?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How to fix toll charge for a particular vehicle at toll booths in a highway?
how to calculate the scour depth
how to calculate weight of 1.8 cum of aggregate
what is the water-cement ratio of mix design while 30mpa in 7 days?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What you understand by building codes?
what is total volume of ingredients used in concrete accordingly
what is constat for brickwork