Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is mean civil

5 4425

how to calculate width and thickness of columns and beams for differnt area with example

1 3740

explain the advantages of total stasion

728




what is the tool used at construction site for measuring cement, sand and blue metal in india.

1 7845

What are the alternate material for steel, Sand and aggregate

Simplex, NASA,

980

Is there any alternate for plastering

1 2812

What is the meaning of "TOR" ??

2 6490

What is the meaning of TMT on Steel rebars

6 7802




insted of bentonite we can use any alternate material in piling ?

823

Insted of water is there any liquid to mix in concrete / in mortar ?

2 2294

at what height brick masonr, block masonry & Concrete wall can construct in a day ?

2 3458

why we can use dust in concrete insted of fly ash

720

in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

UltraTech,

708

what are the construction sequences in DAM, Hygh Way / Road, Thermal Power Plant, Hydro Power Plant, Tunnel ?

RRB,

2 5242

What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

AltraTech,

718


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

what is diffrence between catchment area,watershed and basin?

1505


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

879


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

1008


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

2398


cement and sand required for one block of size 0.23*0.15*0.46

420






what is the difference between prime coat and tack coat in road construction

2831


I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,

882


I need old MMUP exam question and answer for Civil engineering

120


what is education Cess.

841


Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

944


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

1651


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

18


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

973


a butt weld is specified by

932


Gidc technical que paper

370