Civil Engineering Interview Questions
Questions Answers Views Company eMail

What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?

Kirloskar,

1830

what is step foundation

2 5390

How to calculate super built up area in residential building

1 7291

WHAT IS THE UDL OF TOWER CRANE?

Hinduja,

2407

can we go for short rcc column without any steel rienfocement carrying truely axial load only???(No other load acting on it such as wind load,earthquake & lateral earth pressure)

Lodha,

2 5184

what is column foundation

1852

what is pile and deam foundation

DLF,

1827

what is Short bored pile foundation.

2219

explain the rale of the government in the construction industry

SP Singla,

1937

how can economic during construction of a project.

1697

what is polity

1668

explain what do you mean by the property development.

SVS Constructions,

1641

by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

1708

how we can design the design mix(m25)

1 4287

A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?

6 9531


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1774


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1687


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

1509


how to calculate load bearing column

3080


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1882






How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1406


why we can use dust in concrete insted of fly ash

1709


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1476


What things architect have to take care of before starting any project?

763


what is the difference between tsp & tower

1732


What are the types of slump?

650


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

1815


how to create our resume?

1672


can you provide a link for manual design of building?

1136


what are the five benefits of using standard terminology in the measurement process?

1689