Civil Engineering Interview Questions
Questions Answers Views Company eMail

how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???

3 4538

what is the advantage of electronic theodolite over transit theodolite?

3 12471

how much cement and sand required for 1cum rr masonry

3506




How to preparation billing for high rise building? anyhow can give the tips

L&T,

2 7722

1m=3.281feet in that what is .281 mm cm m or anyother

1 3509

what is the minimum compressive strength of clay brick

VNC, Ananya Construction Infrastructure,

911

Advantages and Disadvantages of using fly ash bricks over clay bricks?

Pradhi Engineering,

11 100352

In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

2157




does a b.tech civil engineer fresher supposed to know how to design rcc structure?

2209

Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

L&T,

1 2400

Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

Bhel,

796

How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

894

Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

861

1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

TCS,

1 4198

1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

1060


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

where can i get the previous question papers for rrb section enginerr (civil)

969


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

473


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

1504


From where the relationship of target strength comes in mix design(graph)

1020


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

1297






what is m30 in concrete tiles

1187


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

325


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

1124


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

937


very simple or less time consuming formula for reinforcement calculation by moment

314


how to control PQI (Project Quality Index)

7239


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

519


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

864


what could be the production cost of 1 cum of concrete by CP30 plant

539


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

899