In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
3276Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
L&T,
1 4085Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Bhel,
1953How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
2219Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
2010Post New Civil Engineering Questions
What are the reasons for geotechnical site investigations in uganda?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What are the applications of the modulus of elasticity?
How to find permissible diagonal tensile stress in reinforced brick work
Please design 12.5m long dubbly beam
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
What type of tensile strength is handling by crank in beam? Thanks.
How much cement is require in one sqft area in a G+3 residential construction.
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is absolute pressure? How absolute pressure is calculated?
Aptitude, reasoning, quants, verbal and technical question
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
What are the main reasons for conducting pull-out tests for soil nails?