in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
3931Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
2 9688With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2504How many cncrete grades are used for construction,explain with proportion,grades and where it used
4 8984Post New Civil Engineering Questions
I need old MMUP exam question and answer for Civil engineering
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What are the methods of measurement? Describe it shortly
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
is basic cost of the material includes tax?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How do we calculate the power of centrifugal pump?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
In block work seawalls what is the purpose of slip joints?
How many litres of water used for curing of 1000sqft of slav
Why the statue of liberty is made of copper?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Define line type?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?