Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS

1 1942

in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

1 3931

How much quantity of coping is done per day by one mason in Rmtr?

2 5952

what is th consuption of cement , sand in plastering for 15mm thick cm1:4,1:3

1 10745

1 cubicmeter liquid = how much litre

6 11993

Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.

2 9691

what cement consumction plaster 15mm think per sqmt 1:3&1:6 how much kg.

3 24025

With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

Power Plant,

1 2506

what is the IS code no. for concrete wastage?

3329

what is the IS code no. for concrete wastage?

1 5978

What the codes used for Rigid Pavement and Flexible pavement.

bscpl,

1 6145

How many cncrete grades are used for construction,explain with proportion,grades and where it used

Unicel,

4 8992

What is the proportion of M30 to M80and which construction these are used

Unicel,

3 7689

What is a Quick Sand?

3 7647

What are the tests to be conducted on cement?

RRB,

5 12195


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

What is the strength of 1:6:12 mix?

3143


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2343


HOw much % of premium on DSR-2013 currently

2027


what is the 0 value in quantity surveying

2453


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2518


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2249


can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2212


What is the per cu. mt. price of ready mix in Gujarat region.?

2409


how can we calculate steel value, depending on load

2410


I need to constructive work in amaraj batteries

1921


please send me bhel questions on rupesh.017@rediffmail.com

2769


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1913


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2216


VAT and CST ? Which benefits for buyer ? Why benefits?

1884


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2223