in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
3821Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
2 9432With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2411How many cncrete grades are used for construction,explain with proportion,grades and where it used
4 8647Post New Civil Engineering Questions
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
What does a construction cost covers and what does not?
what is pqc
what is thumb rule for calculating the size of ISMB required for a particular length of span
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
What goals do you have in your career?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How to activate isometric axes in cad?
What is an ice dam sock?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
What is the release of lien?