Civil Engineering Interview Questions
Questions Answers Views Company eMail

What is allowable limit of silt in river sand for concrete

UIPL,

3 5198

what is the unit for sbc of soil

4 10630

how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

Alembic,

1135




procedure for preliminary selection of size of column of 5 storey building

1537

how we can calculate a bentup hook in difreeent angles.for exp.at 90 degree,45degree,60 degree..

Gammon,

2 4425

what is ppc????

L&T,

13 11905

what is the density of steel

Sepco, NGO, PWD,

10 12124

What is steel requirement for one cum concrete

ECCI,

3 6041




how much steel is required for 1 sqft of slab

6 7233

while doing floring in a room,from where one can start laying tiles.

8 5022

What will be the maximum length of RCC Lintels?

3 8298

How Can You Design Aisolated Footing Subjected To Tenstion Force?

820

qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm

APGenco,

6 8886

Cement proportion in Fly ash bricks and type of cement to be used ?

2 3384

WHAT TYPE OF MATERIALS (CHEMICALS) ADDED IN CONCRETE TO INCREASE THE STRENGTH OF CONCRETE?

2 4590


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

Exterior Joints,define

543


define the strength

873


How to calculate 1 brss for RCC work  

759


how to calculate MR 9(derivation)

1454


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

890






What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

823


What is proportion of PCC Grade G?

791


What are your goals?

848


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

637


HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

802


how to take concrete quantity for precast segment for viaduct project?

1594


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

521


what is the water cement ratio for plastering

293


how to calculate reinforcment in staircase cranked beam?

1219


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

830