give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?
7832what post do you prefer to work in this company and why do you think you can serve better in such position?
22091. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
2624Post New Civil Engineering Questions
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
Define What is an ice dam sock?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How to make a c++ program that converts any base to base 10?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Define relative co-ordinates?
what is the coefficient for running feet to cft coversion both area and price
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
What is the likely strength of a 1:2:4 concrete mix?
what do you know that m20,m25
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
how to caluclate sienerge qty in construction in ap
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what is the construction cost for per cft of multistorryed building in kolkata?
in the earthquqke the profile of water on dam is parabolic or not