We use ungrounded DC system (220V/110V) for control and protection system in substations etc. Suppose we have long 2 core DC cables running from our DCDB in control room to the load (length of around 2 to 3 km). Do we need to protect these long DC cables from earth leakages or not? If yes how?
5 10198WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE
1546earth-fault relay is? a)directional relay b)non-directional relay c)protective relay d)admitence relay
2 5514why anti pumping relay is not given to tripping coil of the breaker? why only to closing coil?
2 5150What is the basic principle of vibration measurement by BENTLY NEVADA vibration measurement system? and Why it gives the -ve voltage output?
14 130440I have an existing old MCCB. ABB Model SACE, the rating are: Ue = 660 volts, Iu =1250 Amps, 3 poles, Ith (max) =800 amps at 45 deg C. I need a circuit breaker for my 3 phase motors, 380 volts 60 hz. the supplier required the minimum ampacity of the breaker to be 911 amps. can i use this breaker with rating of Iu =1250 amps but Ith = 800amps maximum?
1750what are the precuation should be taken ahen installing power transformer,circuit breaker,current & potential transformer
1558in a dc motor we supply current only to the armature conductors,from where is the field winding gets excited then??
3 4765Post New Siemens Interview Questions
Which jsp life cycle is in correct order?
Explain about mappartitions() and mappartitionswithindex()
What can you do for the growth of BHEL?
Explain joiner transformation in informatica
Think of one of your most successful sales you've ever achieved. With that sale in mind, tell me about it and what you did to successfully achieve the sale?
Can corba application have call back?
Is calibri web safe font?
How can you differentiate between powercenter and power map?
How to get current datetime on windows command line, in a suitable format for using in a filename?
Explain invoice verification (iv) in sap. : fi- accounts payable
What is fast start and slow start? Explain the difference between them.
how calculate esi & pf
Define hybrid parameter?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)