In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answers were Sorted based on User's Feedback
Answer / jinchandra
In following context we use bills of material?
[1 ] Material Requirements Planning
[2 ] Execute Production
[ 4] Goods Movements (to Help Data Entry)
[3 ] Product Costing
[5 ] Development/Engineering/Design
[ 6] Documentation
[7 ] Others
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / shanmukha
Product Costing :in order to observe the different cycle
times on the particular product in the bom,for the process
capability&for the costing of that particular product
Is This Answer Correct ? | 9 Yes | 3 No |
Answer / ranjit
Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
Is This Answer Correct ? | 4 Yes | 0 No |
In the monthly lot size proc, how to generate lot at the end of Period?
How can you get planned orders scheduled so that you can do capacity leveling ?
How many types of SOPs are there?
How can I use variable size items?
a company needs 12 standard values. how it can be maintained?
What is processing class, where we do them and why?
What is collective order. Pre requisite of the collective order?
Checkdigit example
What is the difference between stock transfer order and stock transport order ?
Tell some standard order types and what configure done for current project
Define ‘bom group’?
Explain how ‘pp’ is ‘integrated’ with other modules?