In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / sriram
1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What are some important tables used in pp (production planning)?
Explain what is sap pp?
In lsmw which is the most important step?
what is std info set? where it is used?
What are all the steps involved in Variant Configuration?
Define mrp list
What is the standard info set?
What are the t-codes for creating, changing and summarizing bom?
Mention what is the production process in sap?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
Difference between Manual reorder point and Automatic reorder point.
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What is primary cost and secondary cost?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?