In which context do you use bills of material?
[ ] Material Requirements Planning
[ ] Execute Production
[ ] Goods Movements (to Help Data Entry)
[ ] Product Costing
[ ] Development/Engineering/Design
[ ] Documentation
[ ] Others
Answer Posted / sriram
1.Material Requirements Planning
2.Execute Production
3.Product Costing
4.Documentation
5.Development/Engineering/Design
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How did you configure the payscale structure?
Explain LTP.
What is mrp controller means?
Define gaps.
What is 'capacity planning'?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
what do you mean by planning time fence
What is scope of planning?
Mention what are the t-codes for creating, changing and summarizing bom?
Explain the planning steps for 100 products?
What are the basic dates?
Mention what are the keyfields found in mrp view 1?
What is the production process in sap?
Explain the uses of the simple maintenance interface?