types of mrp?
Answers were Sorted based on User's Feedback
Answer / venkat naresh racharla
They r two types of MRP
1) MRP :Material requirement planning
2) MPS : Master production schedule
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / mahesh
PD : Mrp planning. explote the BOM upto last level and create the planned oder from finish product level to raw material level
MO : Master schedling planning : the BOM upto next level of the final product.so create the planned order for the final product and create depended reqmt for the next level material
MRp Type P1 or M1:
Ans: THe order proposal that lies within the planning time fence is firmed automatically as soon as its date lies at least one day before the finish date of the planning time fence. The date of new order proposals that are actually created in the planning time fence are rescheduled out to the end of the planning time fence. Therefore, these new order proposals are not firmed
MRP type P2 or M2:
Ans: An order proposal that lies within the planning time fence is automatically firmed as soon as its date lies at least one day before the end of the planning time fence. The system does not create any new order proposals within the planning time fence. That is, the shortage situation is not adjusted within the planning time fence.
MRP type P3 or M3:
Ans: Order proposals that lie within the planning time fence are not firmed automatically. The order proposals required to cover the requirements are moved to the end of the planning time fence
MRP type P4 or M4:
Within the planning time fence, the system creates no order proposals automatically. That is, the shortage situation is not adjusted within the planning time fence.
M4 is to classify the MS parts and P4 is for normal MRP items. BOm will be exploded in both cases to lower levels if procurement proposals created within or outside the time fence.
VB/VM - here , the system do not consider the reqmt (pir or sales order ) , it check the reorder level in the material master and create the planned orde / pr once the stock reach the level.
ND : no planning . so the material will not be consider for planning
XO : If you are going to do MRP planning the external . say APO or other you can use this type of mrp
Is This Answer Correct ? | 4 Yes | 1 No |
how costing is done in pp or how u will know the cost of a product which is manufactured in ur plant
what you heard about super BOM
Integration of PP with MM , Integration of PP with SD .
What do you mean by Production Support,with some examples?
Explain the mrp list and their uses.
What is the data you give in SOP
What is the production process in sap?
Do your single-level BOMs represent production levels and do you keep your BOM header materials in stock? If not, do you produce non-stock items, or are some assemblies just used as structural elements in a BOM?
What is plm (product lifecycle management) in sap pp and what is the use?
Explain why there is need of production version?
What do we do in the realization phase?
What is Production scheduling Profile and use of it?