explain BOM usage and status?
Answers were Sorted based on User's Feedback
Answer / rasika deshpande
By means of BOM usage, you can manage separate bills of
material for various internal organizational areas
(engineering/design, production, costing, and so on).We can
define different boms for the different areas of the
company, such as design dept, production, sells and
distribution etc. , depending on their individual
requirement. This can be done by choosing different usages
while creating the bom.
The BOM status specifies whether a bill of material is
active or inactive for different organizational areas.
it can be seen at header level of the bom.
Is This Answer Correct ? | 13 Yes | 4 No |
Answer / atul y
The bill of material usage specifies the departments or
functions within a company where the bill of
material is used.
The BOM status controls BOM processing in different
application areas
Example:
BOM X:
BOM with status '1' can be exploded in MRP and released for
a planned order.
BOM Y:
BOM with status '2' cannot be exploded in MRP or released
for a planned order.
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / venkatesh
Bill of Material is the quantity details of each item used
for producing a finished product.
Is This Answer Correct ? | 1 Yes | 4 No |
Can any body explain me why work scheduling view is required for semi finished and finished products?
Product Costing Run is over. Now If I add one more rawmaterial for that material also it has to included & run the cost. But it is not happening?
What is mrp list and what is the use of it?
What is internal payroll process?
how to know a component create date after WO released
what is the need of pp in sap, what is the flow diagram of sap pp.
How can you get planned orders scheduled so that you can do capacity leveling ?
What is the difference between pp and pp-pi? Which one is better and how ?
What is mrp controller means?
What is the use of mrp group?
types of mrp?
How is indian slab and us slab?