Difference between different strategy groups.
No Answer is Posted For this Question
Be the First to Post Answer
What happens to plan after it has been converted into production order?
Explain Flexible Planning procedure or How many levels of Flexible planning.
One component 2 times assign to bom
Which BOM maintenance functions do you require (copy functions, mass changes, and so on)?
I want to make a career in SAP-PP/QM from the existing manufacturing experence.
In cost controlling information system mention the fields that are listed in the list screen of the report?
Consignment matl how will be use
Control keys
Different types of consumption based planning.
Hi, I have run the standard cost estimate for one product. Can any one tell me the planning steps for 100 products. Sravan
What are sequence, parallel, overlapping, splitting and where can we assign these
what is Standard order type